Application Case
Zhejiang Ruihui Intelligent Technology Co., Ltd. is committed to becoming a trusted
partner in the digital and intelligent transformation of China's manufacturing industry.
By deploying a MOM (Manufacturing Operations Management) platform integrated with a full-process quality traceability system, this solution was implemented in stages without disrupting production. Starting with the sewing workshop, it was then progressively rolled out to each production line in the assembly workshop. The system seamlessly integrates with the client's existing ERP system to achieve data interoperability, establishing a digital operational framework that covers both the assembly and sewing workshops.
1. Case Basics
Case Title: hongli Zhixin Magna Car Seat (Chongqing) Co., Ltd. | Digitization of General Asshirting Workshop and Sewing Workshop
Customer name : magna Car Seats
Industry : Auto Parts
Enterprise size : industry benchmark enterprise
Project cycle :6 months
2. The customer's original pain points
Combined with the actual project, the pain points are described as follows:
Production pain points : slow response to plan execution, difficult process coordination and low assembly efficiency.
Logistics/storage pain points : materials rely on manual management, material finding takes time, and material loss lacks effective monitoring.
Quality/traceability pain point : key processes (such as seat assembly) lack effective quality control means, and it is difficult to trace quality problems.
Management/system pain points : the original system cannot be connected, the data is isolated, and the production status cannot be monitored in real time.
3. Our solution : with "digitization and collaboration" as the core, the customized solution is as follows:
Deployment system :MOM platform + whole process quality traceability
Hardware configuration :-(Fill in according to actual project, the user text here does not mention hardware configuration)
Implementation content : implementation in stages, first sewing workshop online, and then gradually extended to each production line of assembly workshop to ensure production continuity, simultaneous personnel training.
System integration : Seamlessly connect the customer's existing ERP system to realize data exchange and process coordination.
4. Project implementation effectiveness : after digital transformation, the core indicators have been significantly improved:
Efficiency class : scheduling efficiency has been improved by 15%, logistics transfer efficiency increased by 2%
Quality category : product defect rate decreased by 0.5, quality inspection efficiency increased by 2%, missing rate drops below 1%
Cost category : save 10 people/year, reduce material loss by 2%, inventory turnover increased by 15%
Management : delivery punctuality increased from 80% to 90%, production data can be checked in real time, traceback coverage 100%
5. Case highlights
Electronic process replaces manual management : electronic process card greatly reduces labor cost and error data.
Precise material control : Intelligent allocation and progress tracking to reduce WIP backlog and waste.
Real-time quality control closed loop : real-time warning of production abnormalities, significantly reduced defect rate, and controllable quality traceability.